Power Apps development cost: the build is the smallest part

Power Apps development gets sold as the cheap option. Microsoft positions low-code as the faster, lighter alternative to writing software, and the word everybody hears is cheaper. So the first question on almost every project we quote is some version of “it’s only a Power App, why does it cost that?”
The honest answer is that the development isn’t the expensive bit. It never was. What costs money is the design work that has to happen before anyone opens the maker portal, the testing that runs the whole way through, and the adoption work that decides whether anybody uses the thing once it’s built.
Nobody shines a light on that part. The demos show someone building a working app in forty minutes, and the forty minutes is real. It just isn’t the project.
What follows is where the money actually goes on a Power Apps build, what we typically see a first year cost, why year two looks completely different, and the point at which we’d tell you to write custom code instead.
Quick summary
The figure worth anchoring on is that a medium-complexity app often lands around £30,000 in its first year, and the development itself is the smallest line in that number:
Which is also why the comparison people reach for doesn’t hold. An off-the-shelf product has a lower year-one number and asks you to change your processes. A Power App has a higher year-one number and doesn’t.
Why “cheaper” is the wrong word
Microsoft’s own positioning of low-code is about speed and accessibility, and both claims are true. You really can build a working application without a development team, and you really can do it in a fraction of the time that traditional software delivery takes.
The problem is what people hear. Faster and more accessible get compressed into cheaper, and cheaper sets an expectation that the quote then has to argue with. This comes up in almost every project we price, which is why it’s worth addressing head on rather than in a footnote.
Here’s the distinction that matters. Low-code makes the building cheaper. It doesn’t make the project cheaper, because building was never the expensive part of software delivery. Deciding what to build, proving it works, and getting people to use it were always the expensive parts, and no amount of drag-and-drop touches any of them.
So when a Power App comes in at a number that feels high for “just an app”, the gap isn’t in the pricing. It’s in which activity people think they’re paying for.
What Power Apps development actually costs
Our typical figure for a medium-complexity application is around £30,000 in the first year, and most of that is the project rather than the licences.
Complexity is what moves that number, and it’s driven by a few specific things: how many data sources the app has to talk to, whether any of them need custom integration work, how intricate the security model is, and whether the process the app supports is well understood or is being redesigned at the same time. That last one is the quiet killer. An app that automates a process nobody has agreed on yet isn’t a development project, it’s a business analysis project with an app at the end.
What the figure isn’t is a licence cost. The licensing side is comparatively small and entirely predictable, which is the next section. If your budgeting conversation is mostly about licence counts, you’re looking at the wrong end of the number.
And it’s a first-year figure deliberately. The shape of Power Apps spend over time is the single most misunderstood thing about it, and we come back to that below.
Where the money goes, in order
Design, before anybody builds anything
The data model and the security model have to be right before development starts, because both are expensive to change afterwards.
Getting the data model wrong means tables that don’t support the relationships the business actually needs, which surfaces three months in as “can it also show us X” and turns into rework. Getting the security model wrong is worse, because in Power Apps security isn’t a layer you add at the end. It’s expressed in how the data is structured, who owns records, and which environment the solution lives in.
This is the phase people don’t see in a demo and don’t expect in a quote. It’s also the phase that determines whether everything after it goes smoothly or doesn’t.
Testing, running throughout
Testing in a Power Apps project isn’t a stage before go-live. It runs the whole way through, because the point of iterating quickly is that you find out quickly whether what you built behaves the way the business needs.
That means real users touching real screens with real data, repeatedly, not a test script executed once at the end. It costs time from the client as well as from us, and it’s the single most common thing to get cut when a budget gets squeezed. It’s also the cut you regret, because the alternative is discovering the problem after a hundred people have started depending on the app.
Adoption, which decides whether any of it mattered
An app nobody uses cost exactly as much as an app everybody uses, and returned nothing.
Adoption work means the people who’ll use it understand why it exists, know how it fits their day, and have somewhere to go when something doesn’t make sense. It’s training, communication and a support route, and it belongs in the project rather than in a hopeful email on launch day. Where teams need to build and maintain their own apps afterwards rather than coming back to us each time, structured Power Platform training is usually cheaper than the alternative.
Build, the bit everyone budgeted for
Which brings us to the development, the part that gets all the attention and takes the least of the effort.
It’s genuinely quick. That’s not marketing. A competent maker with a settled data model and an agreed design can produce working screens fast, and the speed is the reason low-code is worth using at all. The mistake is reading that speed as the whole cost.
Licensing is the predictable part
The licensing side is the easiest part of a Power Apps budget to get right, because Microsoft publishes it.
On Microsoft’s UK Power Apps pricing, Power Apps Premium is £15.40 per user per month paid yearly, excluding VAT, and drops to £9.20 per user per month on the plan with a 2,000-seat minimum. Dataverse database capacity is £30.80 per GB per month, which is the line most people forget exists until their storage report arrives. The per-app plan is no longer listed, which is why our Power Apps licensing post argues for going premium-first rather than trying to engineer around entitlements.
If your app triggers flows as part of its function, those are generally covered by the Power Apps licence rather than needing separate Power Automate licences, and our Power Automate cost post covers where that boundary actually sits.
Worth knowing
Microsoft has announced a price increase for Power Apps Premium effective 1 January 2027, the first list price rise for the product in over five years. The published figures are US list prices, going from $20 to $22 per user per month, and from $12 to $14 on the 2,000-seat plan.
Microsoft states the increase applies globally “with comparable pricing in local currencies” but has not published a GBP figure, so we’re not going to convert one and present it as a UK price. What’s worth acting on is the other half of the announcement: existing subscriptions keep their current price through the end of their term, and the new price applies to new purchases, renewals and co-terminations with terms starting on or after 1 January 2027. If you’re renewing in late 2026, the timing of that renewal is worth a conversation. Microsoft’s own pricing announcement has the detail.
Year one and year two are different businesses
This is the part that reframes the whole cost conversation, and it’s the reason we push back on comparisons to off-the-shelf software.
A Power App is bespoke. It’s built around the way your organisation already works, matching the technology to your processes rather than the other way round. That’s why year one is front-loaded: you’re paying for something to be shaped to fit.
An off-the-shelf product inverts that trade. The year-one number is lower, and the cost shows up as process change, workarounds, and the permanent friction of a tool that was designed for somebody else’s business. That cost is real but it doesn’t appear on an invoice, so it doesn’t get compared.
From year two onwards the Power Apps position changes completely. The design work is done, the data model is settled, the adoption has happened, and what remains is licensing plus whatever enhancement you choose to fund. The savings from that point can be substantial, and they compound, because you’re no longer paying for the thing that cost the most.
Which means the only fair way to compare the two is across several years, not one. A three-year view usually tells a very different story from a first-year quote, and if a procurement process is only looking at year one it’s structurally biased towards the option that fits you worst.
When custom development wins instead
We sell Power Apps work, and there’s still a point where we’d tell you not to use it.
Two situations in particular. The first is where the requirement needs huge amounts of custom code. Power Apps will let you extend with custom connectors and code components, but once the majority of the value sits in bespoke logic rather than in the platform, you’re using a low-code tool as an expensive wrapper around a development project. At that point the platform is working against you.
The second is where a lot of external access is required. Power Apps licensing is built around named internal users, and once you need people outside the organisation using the thing at any scale, you’re into Power Pages and a different cost model entirely, priced per authenticated user rather than per employee. That can be absolutely the right answer, but it needs costing deliberately rather than discovered late.
Worth saying that the boundary is softening. The two worlds are increasingly blending, with low-code platforms absorbing more genuine development capability and development teams using low-code for the parts that don’t need bespoke work. The question is less often “which one” and more often “which parts of this go where”.
Who shouldn’t build in Power Apps
If the process you’re automating hasn’t been agreed yet, don’t start building. You’ll pay to develop a moving target and you’ll blame the platform for the result. Settle the process first, even informally.
If you need the application to look and behave in a very specific way that the platform doesn’t naturally support, the fight isn’t worth it. You’ll spend the saving on workarounds.
And if nobody internally is going to own the thing after launch, reconsider the whole idea. Apps need an owner, and an unowned app is one of the ways Power Platform governance quietly fails as organisations grow.
Want a real number before you commit a budget?
We’ll look at what you’re trying to build, how many systems it has to reach, and who needs to use it, then give you a cost for the whole project rather than just the build. If the honest answer is that an off-the-shelf product fits you better, or that the process needs settling first, we’ll tell you that instead of quoting.
The bottom line on Power Apps development cost
Power Apps development is the cheapest part of a Power Apps project, and understanding that is most of what makes the cost conversation sensible. Low-code compressed the build. It left design, testing and adoption exactly where they were, and those were always where software projects spent their money.
Our typical first-year figure for a medium-complexity app is around £30,000, and the licensing inside that is small and predictable at £15.40 per user per month on Microsoft’s current UK list. If a budgeting conversation is mostly about seat counts, it’s pointed at the wrong end of the number.
The comparison that actually matters is across years rather than within one. Year one buys something shaped around how you already work, which is why it’s front-loaded. From year two the heavy spending has happened and what’s left is licensing plus whatever you choose to improve, which is where the return shows up. Judge it on one year and you’ve structurally favoured the option that fits you worst.
And it isn’t always the answer. Where the requirement is mostly custom code, or where a lot of external users need access, custom development or Power Pages will serve you better, and we’d rather say so at the quoting stage than halfway through.
Our Power Apps consultancy work usually starts with the process rather than the app, because what the process actually needs is what determines whether any of this is worth building. If the wider question is which of your processes should be automated at all, our business process automation work is the better place to begin.
STRAIGHT ANSWERS
Frequently asked questions
How much does a Power App cost to develop?
Our typical figure for a medium-complexity application is around £30,000 in the first year, and most of that is project cost rather than licensing. What moves the number is how many data sources the app has to reach, whether any need custom integration, how intricate the security model is, and whether the underlying process is settled or is being redesigned at the same time. Licensing on top is £15.40 per user per month on Microsoft's current UK list for Power Apps Premium.
Why is Power Apps development more expensive than people expect?
Because low-code made the build cheaper and left everything else alone. The design work on the data model and security model has to happen before anyone builds a screen, testing runs throughout rather than once at the end, and adoption decides whether the finished app gets used. Those three were always the bulk of software project cost. The forty-minute demo app is real, it just isn't the project.
Is Power Apps cheaper than custom development?
Usually, but not always, and the fair comparison runs over several years rather than one. Power Apps is bespoke software shaped around how you already work, so year one is front-loaded and year two onwards is mostly licensing plus whatever you choose to enhance. Where it stops being cheaper is when the requirement needs large amounts of custom code, at which point you're paying for a low-code wrapper around a development project.
What does Power Apps Premium cost in the UK?
£15.40 per user per month paid yearly excluding VAT on Microsoft's UK list, falling to £9.20 per user per month on the plan with a 2,000-seat minimum. Dataverse database capacity is charged separately at £30.80 per GB per month and is the line most often missed in budgeting. Microsoft has announced an increase effective 1 January 2027, published in US dollars, with existing subscriptions keeping their current price to the end of their term.
What's the hidden cost in a Power Apps project?
Adoption, most often. It's the easiest line to cut when a budget tightens and the one that determines whether the spend returned anything, because an unused app cost the same as a used one. After that it's Dataverse storage, which accrues quietly, and the business analysis time for a process that turned out not to be as well defined as everyone assumed.
When should we not use Power Apps?
When the process hasn't been agreed yet, because you'll pay to build a moving target. When the majority of the value sits in bespoke code rather than in the platform. When a lot of external users need access, which moves you to Power Pages and a per-authenticated-user cost model that needs pricing deliberately. And when nobody internally will own the app after launch.
Do we need separate Power Automate licences for flows inside the app?
Generally not, if the flows run as part of the app's function. They're usually covered by the Power Apps licence rather than needing their own, which is one of the better-value aspects of going premium-first. The boundary matters though, and standalone flows that run independently of the app are a different question.
KEEP READING
